| Sharpen Your Cost
Estimating Skills
Larry R. Dysert
Cost Engineering, Vol. 45, No. 6
AACE International, Morgantown, WV, 2003 |
|
Increasingly limited
capital budgets in the chemical process industries (CPI) force
management to make effective, early decisions regarding
investments in strategic assets, often with little or no
engineering input. As potential projects are considered, these
individuals often find themselves in situations where they must
decide whether a specific project should be continued. At each
stage of funding, management requires cost estimates of increasing
accuracy. Determining which estimating method to use at each stage
depends on the information available at the time of preparation,
the end use of the estimate, and its desired accuracy. This
article discusses various estimating methodologies, from
conceptual to definitive, for calculating cost of capital projects
in the CPI; and identifies the technical deliverables required to
prepare each type of estimate. The techniques used for each type
of estimate are discussed. These estimating methodologies, and the
engineering information required to support them, should be
understood by all engineers. |
| Download/View PDF |
|
Originally
published by AACE International.
Reprinted
with the permission of AACE International,
209
Prairie Ave, Suite 100, Morgantown, WV 25601 USA.
Phone
800-858-COST/304-296-8444. Fax 304-291-5728
Internet:
www.aacei.org
E-mail: info@aacei.org
Copyright
© by AACE International; All Rights Reserved |
|